Newest
-
Jewellery & Gem ASEAN Bangkok (JGAB) 2025: Connecting ASEAN's Gem and Jewellery Business to the Global Market
-
BioCity Biopharmaceutics Co., Ltd. Announces Clinical Collaboration to Evaluate BC3195 in Combination with KEYTRUDA® (pembrolizumab) in Patients with Locally Advanced or Metastatic Solid Tumors
-
Acer Reports FY2024 Net Income of NT$5.54 Billion and NT$1.7 Cash Dividend Per Share
-
Ping An #1 in Brand Finance's Global Insurance Brand Value for 9th Year, Brand Value Reaches $33.6 Billion
Brevik Carbon Capture Plant Reaches Mechanical Completion
2024-12-04
Aker Horizons
HaiPress
FORNEBU,Norway,Dec. 2,2024 -- SLB Capturi,a joint venture between SLB and Aker Carbon Capture ASA (ACC ASA),an Aker Horizons portfolio company,announced the mechanical completion of the carbon capture plant at Heidelberg Materials' cement facility in Brevik,a significant milestone for the CCS project.
ACC ASA holds 20% ownership in SLB Capturi,which is delivering CO2 capture,conditioning,compression,heat integration,intermediate storage and loading facility for the plant. The carbon capture plant is designed to capture 400,000 metric tons of CO2annually from the cement facility. The development will now move into commissioning phase and is planned to be operational by 2025.
The Brevik carbon capture plant is part of Longship,the full CCS value chain development enabled by Norway's strong competence in both carbon capture and storage.
SLB Capturi is a joint venture between SLB andACC ASA,combining the strengths and capabilities of both companies to accelerate industrial decarbonization at a global scale. SLB owns 80% of SLB Capturi,while ACC ASA owns the remaining 20% stake.
For further information,please contact:
Stian Andreassen,Investor Relations,Tel: +47 41 64 31 07,stian.andreassen@akerhorizons.com
Mats Ektvedt,Media,Tel: +47 41 42 33 28,mats.ektvedt@corporatecommunications.no
This information was brought to you by Cision http://news.cision.com
https://news.cision.com/aker-horizons/r/brevik-carbon-capture-plant-reaches-mechanical-completion,c4074512